Central signal box S-Bahn Berlin Halensee Renewal of the power supply
To ensure the greatest possible operational safety, DB AG commissioned a fundamental renewal of the power supply to the central interlocking of the Berlin S-Bahn in Halensee. Approximately 60 % of the Berlin S-Bahn network is controlled via this signal box. The building complex was erected in 1927 and is a listed building. Today, this building complex houses an S-Bahn operations centre with the ESTW Westkreuz, a network control centre and a rectifier substation (Guw Halensee).
Since 2007, the reconstruction measures have been carried out in numerous construction phases, step by step and in sections, during ongoing operations. To date, 27 construction stages have been planned and realised for the control and safety technology.

Disciplines
- Railways
Companies
GRE German Rail Engineering GmbH
Client
Spitzke SE
Duration
From 2007 to 2024
Location
Berlin , Germany
Project Activities
Planning of railway equipment in phases 1-4, 5, 6+7 (electrotechnical systems, medium voltage, low voltage, lighting, lightning protection systems, equipotential bonding, telecommunications systems, control and safety systems)
Preparation of as-built documents
Project planning of traffic facilities and outdoor facilities Lph 2-4, 5, 6+7 (cable civil engineering, drainage, outdoor facilities/paths/roads)
Project and structural planning of buildings Lph 2-4, 5, 6
Technical parameters:
- Renewal of the main power supply incl. medium voltage and transformers 10/0.4 kV (2x 800 kVA), switchgears
- Potential separation between urban and mainline railway
- Erection of a diesel emergency power system in a separate outbuilding with a capacity of 1,350 kVA
- Installation of a new uninterruptible power supply (UPS)
- 30 kV cable relocation
- Installation of a second UPS in the new building including power supply, battery system and refrigeration technology
- Renewal of the lightning protection system for the entire building complex
- Power supply of new facilities (e.g. emergency control stations), renewal of lighting and extension of air-conditioning systems
- New construction of a fire alarm access control, video and telephone system, extension of MAS 90 and PRISMA systems
Project Images

