Hölzlinger Weg road overpass, Mühldorf am Inn ABS 38 Munich - Mühldorf - Freilassing
In order to expand capacity and increase the line speed to 160 km/h, the Altmühldorf - Tüßling section was to be upgraded to double track. The single-track section Altmühldorf - Tüßling is a central component of the upgraded line ABS 38 Munich - Mühldorf - Freilassing.
Due to the arrangement of the second track, the two-lane road overpass of Hölzlinger Weg had to be renewed with new clearances.
The footpath and cycle path had to be adapted to the new conditions.
The structure was built as a three-span construction.

Disciplines
- Railways
Companies
GRE German Rail Engineering GmbH
Client
DB ProjektBau GmbH
Duration
From 2009 to 2015
Location
Bavaria, Germany
Project Activities
- Project planning civil engineering structures 2-4, 6 and 7
- Project planning traffic facilities Lph 2-4, 6 and 7
- Structural design of engineering structures Lph 2-3 and 6
- Coordination with Deutsche Bahn AG regarding railway operations during the construction period, preparation of a crossing agreement including a replacement calculation and various fictitious designs and coordination of the measures for the relocation of divisions
Technical parameters:
- Spans: 7.35 m / 11.30 m / 7.35 m
- Clear width: 6.40 m / 10.60 m / 6.40 m
- Clear height: ≥ 5.70 m
- Overall length: 26.00 m
- Total width: 4.85 m