Pipelines for LPG, Propane, Butane, Natural Gas and Water for Gas Separation Plant
Within the scope of a gas project in Thailand, consisting of a gas separation plant and marine terminal with tank farm and jetty, 5 transfer pipelines had to be design for the transportation of LPG, propane, natural gasoline and water.
- LPG pipeline from gas separation plant to marine terminal, diameter 10”, length 63 km
- Propane / butane pipeline from gas separation plant to refinery near marine terminal, diameter 8”, length 63 km
- Natural gasoline pipeline from gas separation plant to marine terminal, diameter 4”, length 63 km
- Water pipeline from Dok Krai reservoir to gas separation plant, diameter 500 mm, length 23 km
- Water pipeline from Bang Bhra reservoir to marine terminal, diameter 125 mm, length 21.2 km

Disciplines
- Oil & Gas
Companies
Dorsch Consult asia Co., Ltd.
Client
Petroleum Authority of Thailand (PTT)
Duration
From 1981 to 1984
Location
Khao Bo Ya, Thailand
Project Activities
(DC services within Linde-Dorsch consortium)
- Local site investigations
- Basic engineering
- Hydraulic calculation and optimization study
- Preparation of specification
- Checking of contractors‘ detailed design
- Construction supervision