International Airport Heliport Relocation
Along with the General Planning project of apron areas ramp 3 it was necessary to relocate the former heliport.
The new heliport which is located on a 6 m level earthwork embankment and contains landing area scaled 50m x 50m with including lighting.
In the south of the heliport, 6 helicopter parking places have been built, with a total area of 5,000 m2, as well as the necessary link areas including edge lights and apron lighting.
Disciplines
- Airports
Companies
Dorsch Engineers GmbH
Client
FMG Munich Airport Authority
Duration
From 2002 to 2002
Location
Munich, Germany
Project Activities
Design, site supervision, acceptance, and commissioning for:
- Large scale earth works
- Supply (ELT/FM/AW/LW - Trassen)
- Road links
- Asphalt and concrete areas
- Navaids
- Apron lighting
- Security fencing
Project Management:
- Cost control
- Time control
- Coordination and site organisation for all measures