G-Steel Extension of Water Treatment Plant
G-Steel Public Company intended to expand their steel producing plant at Rayong, Thailand.
The new facilities to be installed at the existing plant are as follows:
- Reversing Roughing Mill
- Walking Beam Furnace
- Tunnel Furnace
To supply those processes with sufficient cooling water a water treatment plant is required.
The water treatment plant can be split into the following parts:
- Raw Water Intake – Filtration Required Only for Periods of Heavy Sedimentation
- Indirect Cooling Water supply – Open Loop and Closed Loop ICW Recirculation System
- Direct Cooling Water supply – Direct Recirculation System
- Sludge Handling System – Sludge Handling and dewatering system potable Water System – Enhancement of Potable Water Pumping System
- Enhancement of Fire fighting Pumping System
Total Water Circulation 3600 l/hour

Disciplines
- Hydraulic Engineering
- Sanitation
Companies
Dorsch Consult asia Co., Ltd.
Client
G-Steel Public Company
Duration
Since 2007
Location
Rayong Province, Thailand
Project Activities
Definite Design and Cost Estimates
- P&ID’s
- Layout Drawings
- Section Drawings
- BOQ’s
- Cost Estimates (CAPEX, O&M, Financing)
- Electrical Load Lists