Airport Hargeisa

The existing 25-year old airport had to be improved for Boeing 707 and Airbus aircraft to land and take off with the possibility of extending the operational areas for use by wide-body aircraft in future.

Disciplines

  • Masterplanning
  • Airports

Client

Ministry of Public Works

Duration

From 1981 to 1982

Location

Hargeisa, Somalia

Project Activities

  • Survey of proposed operational areas
  • Soil investigations
  • Investigations to improve existing terminal, hangar, utility building, access roads and parking areas
  • Detailed design and preparation of tender
  • documents for new construction of runway, taxiway and apron

Contact