Airport Hargeisa
The existing 25-year old airport had to be improved for Boeing 707 and Airbus aircraft to land and take off with the possibility of extending the operational areas for use by wide-body aircraft in future.

Disciplines
- Masterplanning
- Airports
Client
Ministry of Public Works
Duration
From 1981 to 1982
Location
Hargeisa, Somalia
Project Activities
- Survey of proposed operational areas
- Soil investigations
- Investigations to improve existing terminal, hangar, utility building, access roads and parking areas
- Detailed design and preparation of tender
- documents for new construction of runway, taxiway and apron