Urban Water Supply and Sewerage System
At the time of the project, Banja Luka had population of 230,000, and the water supply situation was critical due to high water losses and faecal contamination of River Vrba, the main water source.
The project “Urban Water Supply and Sewerage System, Banja Luka” focused on improving the reliability and sustainability of the water supply and sanitation services in Banja Luka and thus improving living conditions, raising public health standards and facilitating economic growth. The main project objectives were:
Improving of the water quality of the river Vrbas upstream of the raw water treatment plant.
Ensuring universal, equitable and affordable supply and reducing technical water losses in the town district Caire which in turn reduced energy consumption and ultimately contributed to combatting climate change.
Connecting the town district Tunijce to the public water system.
Implementing a sewerage system for Karanovac.

Disziplinen
- Municipal Infrastructure
Gesellschaften
Dorsch Impact GmbH
Auftraggeber
Municipality of Banja Luka, financed by KfW
Dauer
Von 2010 bis 2016
Standort
Banja Luka, Bosnien und Herzegowina
Projektleistungen
The project comprised four main phases:
Preparation of final design and tender documents
Assistance to the client in tendering and contracting
Site supervision of works
Assistance to the client during the defects Lliability period