Alteration of Office Including Upgrading of Fire Protection (Building 200, Hall C, E2)
Design task is the alteration of former office areas to a travel agency of Fraport AG, the airport operator, and the new design of a luggage deposit and the installation of a HC-elevator.
The total project implementation will be accomplished in individual building phases in close dependence to operational and functional processes.Design and implementation of the project is characterized by requirements of building fire protection and the implementation of clear and transparent architecture.
Design is based upon § 53 HBO ”Special Use Building Systems and Rooms”.

Disziplinen
- Hochbau & Architektur
- Verkehrsberatung
Gesellschaften
Dorsch Engineers GmbH
Auftraggeber
Fraport AG
Dauer
Von 2001 bis 2005
Standort
Frankfurt/Main Airport, Deutschland
Projektleistungen
- Concept Design
- Approval Design
- Final Design
- Preparation of Award
- Participation in Award
- Project Supervision